Our work in water supply and tailings dams is headed by Mr Bill Meynink. Other key personnel involved are Dr Philip Pells and Dr Gareth Swarbrick.
PSM was responsible for the design and supervision of the Nakan Waste Storage Dam at the Kelian Gold Mine in East Kalimantan. This storage system comprises three major embankments:
The main personnel involved were Bill Meynink, who was responsible for hydrology; spillway design; tailings disposal and management, and Philip Pells, who was responsible for embankment dam design, specifications and documentation.
As seen in the table below, between 1993 to 2008, PSM has been responsible for the design and/or construction supervision of approximately 20 large embankment dams.
NAME OF DAM OR PROJECT |
LOCATION |
CLIENT |
HEIGHT |
ROLE PLAYED BY PSM |
DATE OF CONSTRUCTION OR STUDY |
Murung River Diversion |
Sangatta
East Kalimantan |
Kaltim Prima Coal |
|
Hydrology and hydraulics of spillway and 2km diversion channel |
1992/3
Construction completed. |
Nakan Main Dam |
Kelian Gold Mine
East Kalimantan |
Kelian Equatorial Mining |
126m |
Geotechnical investigations, design of sloping core rockfill dam, hydrology and hydraulics of diversion, advice during construction, negotiations with Dam Safety Commission of Indonesia (DSCI). |
1995/7
Construction completed. |
Nakan Saddle Dam |
Kelian Gold Mine
East Kalimantan |
Kelian Equatorial Mining |
76m |
Design of vertical core rockfill dam, construction advice, negotiations with DSCI. |
As above. |
Nakan Boomerang Dam |
Kelian Gold Mine
East Kalimantan |
Kelian Equatorial Mining |
26m |
As above |
1996/7
Construction completed. |
Codisposal Dam |
Stratford , NSW |
CIM Resources |
10m |
Design of zoned earthfill embankment, negotiations and approvals from Dams Safety Committee, NSW, Construction advice. |
1995/6
Construction completed. |
Stratford East Water Supply |
Stratford , NSW |
CIM Resources |
17m |
Design of zoned earthfill dam, approvals from DSC, hydrology of dam, spillway hydraulics. |
1995/6
Construction completed. |
Hume Dam |
Albury, NSW |
Dept. of Public Works, NSW |
|
Assessment of shear strength parameters of the granite foundations beneath the concrete gravity section of the dam.
Specifications for remedial cutoff walls in the southern earth embankment wall. |
1994/5
1997
|
Prospect Dam |
Sydney, NSW |
Sydney Water Board |
|
Member of Expert Review Panel together with Prof. R. Fell and Mr J. Eales into stabilisation works for upstream face of dam built in 1890. |
1993/4 |
Harapan Dam |
Sangatta
East Kalimantan |
Kaltim Prima Coal |
24m |
Design of zoned earthfill embankment, hydrology and hydraulics of multi-pipeline river diversion system. |
1996/7
Construction completed. |
Prima Dam |
Sangatta
East Kalimantan |
Kalitim Prima Coal |
35m |
As above |
1997
Construction completed. |
Ertzberg Dam |
Freeport Mine
Irian Jaya |
Freeport Mining |
35m |
Hydrology of water supply for the Freeport Mine and processing plant. Preliminary design of steel faced rockfill dam. |
1995/7
Proposed Dam |
Cadia Tailings Dam |
Orange , NSW |
Newcrest Mining |
96m |
Geotechnical investigations, design of embankments, spillway hydrology, approvals from DSC of NSW (total project a joint venture between PSM and Knight Piesold). |
1997 – construction commenced.
1998 - completed |
Namuk Tailings Dam |
Kelian Gold Mine
East Kalimantan |
Kelian Equatorial Mining |
56m |
Hydrology and hydraulics of original dam, study of options for raising of central core rockfill dam, assessment of condition of existing embankment. |
1988 (hydrology)
1996/7 (raising options) |
Kaolin Tailings Dam |
Weipa , Queensland |
Comalco |
Various |
Risk assessment of existing dams |
1996 Study only. |
K-West Diversion Dam |
Sangatta
East Kalimantan |
Kaltim Prima Coal |
25m |
Investigation, hydrology of multi-dam, multi-pipeline an channel diversion system for the Kedapat River design of zoned earth fill embankment and spillway. |
1996/1997
Construction to commence 1997. |
K-East Diversion Dam |
Sangatta
East Kalimantan |
Kaltim Prima Coal |
25m |
As above. |
1996/1997
Construction to commence 1998. |
Bengalon Coal Project |
Bengalon
East Kalimantan |
KPC |
Various |
Preliminary design of four multi-dam, multi-channel river diversion schemes and design of complete project sediment control system. |
1994/7
Proposed. |
Duralie Coal Project |
Stroud Road, NSE |
CIM Resources |
Various |
Design of nine zoned earth fill embankments, negotiation and approvals from Dams Safety Committee, NSW, construction specifications and advice. |
1996/1997
Design study continuing. |
Wambo |
Hunter Valley |
PSM (Brisbane) |
20m |
Assessment of safety of an existing embankment plus advice in respect to capping of Charlies Pond. |
2001 |
Mt Bobby Gold Mine-Leighton's Tailings Dam |
Canbelego |
R. W. Corkery & Co. |
- |
Permeability Testing |
2001 |
Elura Mine |
Cobar |
Endeavour Operations |
- |
Tailings Storage in Excavated Pit |
2004 |
Kestral Colliery |
Bowen Basin |
Rio Tinto |
15m |
Audit of tailings and co-disposal facilities |
2004 |
Baal Bone Colliery |
Lithgow |
Roche Mining |
|
Encapsulation of Tailings Dam |
2005 |
Richards Bay |
South Africa |
Rio Tinto |
Various |
Audit of tailings disposal storages |
2005 |
Xstrata |
Queensland |
Xstrata Coal |
- |
Guidelines for capping of coal tailings for Corporate Policy Document |
2008 |
Liddell |
Singleton |
Liddell Coal |
20m |
Design of final displacement capping of tailings dam |
2008 |
Newland Mine |
Bowen Basin |
Newlands Coal Pty Ltd |
-to 80m |
Design of tailings dam system in Ramp1 area to facilitate drying and future capping |
2008 |